Sinopec Tianjin Polypropylene Packaging & Warehouse Project
Project Overview
Project Name: Polypropylene Product Packaging & Warehouse Project
Client: Sinopec Tianjin Branch
Location: Dagang District, Tianjin, China
Project Type: Petrochemical Industrial Warehouse
Structure Type: Portal Steel Frame Structure
Building Area: 7,000 m²
Construction Period: March 2020 – May 2020
Project Status: Successfully Completed
The Polypropylene Packaging & Warehouse Project is located in Dagang District, Tianjin, serving as an important supporting facility for China Petroleum & Chemical Corporation’s polypropylene production operations. The project was designed to provide efficient packaging, storage, and logistics support for finished polypropylene products.
Our company supplied and completed the steel structure system for the warehouse facility, ensuring rapid construction while meeting the strict operational requirements of the petrochemical industry.
Project Scope
The project mainly included the construction of:
Structural Features
Portal Steel Frame Design
The warehouse adopted a portal steel frame structure to achieve:
· Large clear-span interior space
· Efficient warehouse operations
· Flexible equipment arrangement
· Fast construction speed
· Lower long-term maintenance costs
This structural solution is widely used in industrial warehousing and petrochemical storage facilities.
Tight Construction Schedule
The entire project was completed within only: March 2020 – May 2020. A total construction period of approximately 2 months, requiring highly efficient production scheduling and installation coordination.
Industrial Safety Requirements
As part of a petrochemical facility, the project required strict compliance with industrial safety standards during both fabrication and installation.
Operational Efficiency
The warehouse design needed to support smooth packaging operations and efficient finished product storage turnover.
Project Advantages
Fast Construction
Steel structure systems significantly shortened project timelines.
Large Storage Capacity
Optimized interior layout improved storage efficiency.
Industrial Durability
The structure was designed for long-term use in industrial environments.
Cost Efficiency
Steel construction reduced labor costs and accelerated operational startup.
Project Results
The project was successfully completed and delivered on schedule in May 2020, helping improve polypropylene product packaging efficiency and warehouse operations for Sinopec Tianjin Branch.
This project demonstrates our strong capability in delivering fast-track industrial warehouse steel structures for petrochemical and manufacturing clients.
Why Clients Choose Us
This project highlights our ability to support large industrial enterprises with efficient and durable steel structure warehouse solutions.
Our Company
Our Factory
Quality & Certifications
Our Process
Warehouse & Logistics Projects
Commercial Projects
Public Infrastructure Projects
Airport & Transportation Projects
Sports Stadium Projects
Agricultural Projects
Steel Structure Buildings
Steel Structure Materials