Leave Your Message
Sinopec Tianjin Polypropylene Packaging & Warehouse Project
Warehouse & Logistics Projects
Sinopec Tianjin Polypropylene Packaging & Warehouse Project

Sinopec Tianjin Polypropylene Packaging & Warehouse Project zy-tit-icon

Project Overview

Project Name: Polypropylene Product Packaging & Warehouse Project

Client: Sinopec Tianjin Branch

Location: Dagang District, Tianjin, China

Project Type: Petrochemical Industrial Warehouse

Structure Type: Portal Steel Frame Structure

Building Area: 7,000 m²

Construction Period: March 2020 – May 2020

Project Status: Successfully Completed

The Polypropylene Packaging & Warehouse Project is located in Dagang District, Tianjin, serving as an important supporting facility for China Petroleum & Chemical Corporation’s polypropylene production operations. The project was designed to provide efficient packaging, storage, and logistics support for finished polypropylene products.

Our company supplied and completed the steel structure system for the warehouse facility, ensuring rapid construction while meeting the strict operational requirements of the petrochemical industry.

Send Inquiry

Project Scope

The project mainly included the construction of:

Large clear-span interior space
Polypropylene finished product packaging area
Efficient warehouse operations
Industrial warehouse facility 
Flexible equipment arrangement
Material storage zones 
Fast construction speed
Logistics loading and unloading areas 
Lower long-term maintenance costs
Supporting structural systems 

Structural Features

Portal Steel Frame Design
The warehouse adopted a portal steel frame structure to achieve:

· Large clear-span interior space 

· Efficient warehouse operations 

· Flexible equipment arrangement 

· Fast construction speed

· Lower long-term maintenance costs 

This structural solution is widely used in industrial warehousing and petrochemical storage facilities.

01

Tight Construction Schedule

The entire project was completed within only: March 2020 – May 2020. A total construction period of approximately 2 months, requiring highly efficient production scheduling and installation coordination.

02

Industrial Safety Requirements

As part of a petrochemical facility, the project required strict compliance with industrial safety standards during both fabrication and installation.

03

Operational Efficiency

The warehouse design needed to support smooth packaging operations and efficient finished product storage turnover.

Project Advantages

01.

Fast Construction

Steel structure systems significantly shortened project timelines.

02.

Large Storage Capacity

Optimized interior layout improved storage efficiency.

03.

Industrial Durability

The structure was designed for long-term use in industrial environments.

04.

Cost Efficiency

Steel construction reduced labor costs and accelerated operational startup.

Project Results

The project was successfully completed and delivered on schedule in May 2020, helping improve polypropylene product packaging efficiency and warehouse operations for Sinopec Tianjin Branch.

This project demonstrates our strong capability in delivering fast-track industrial warehouse steel structures for petrochemical and manufacturing clients.

Project Results Overview

Why Clients Choose Us

Fast delivery capability
Industrial warehouse expertise
Petrochemical project experience
Precision steel fabrication
Reliable construction scheduling
Cost-effective structural solutions

This project highlights our ability to support large industrial enterprises with efficient and durable steel structure warehouse solutions.