Xiong'an Citizen Service Center — Steel Member Fabrication Case
Project Overview
Project Name: Xiong'an Citizen Service Center — Steel Member Fabrication Case
Location: Xiongan District, Beijing City
Project Type: Large-scale Civic Event Cultural Center
Project Area: 99,600 square meters
Planned land area:24.24 hectares
Commencement and completion dates:2017年12月-2018年4月
Total investment: one hundred million
Project Scale
Programme is the other variable. Start in December 2017, finish in April 2018: five months, which works out at close to 20,000 m² a month. No fabrication shop waits for the complete drawing set at that pace.
Our role was the supporting one. The Tianjin plant of China Construction Steel Structure (North Region) placed part of the member fabrication with us; we have worked as their strategic partner for years. A fabrication subcontract inside a main contractor's system is judged on responsiveness rather than on any single process. Can the shop set up the same day the drawing lands? Can it re-cut the night a revision arrives? Is there spare capacity when the plant's own machines are full?
The Citizen Service Center opened in June 2018 and carries public services, the planning exhibition, temporary offices and an ecological park — the first piece of Xiong'an's functional programme to be delivered. Total floor area is 99,600 m² on a 242,400 m² site.
Put 99,600 m² on 242,400 m² of land and the plot ratio lands at 0.41. That number tells you what the building is: not a single tower but a campus, several low-rise buildings set apart with planting and pedestrian routes between them 〔building count and storeys to be confirmed〕. For a steel supplier that means the difficulty is not tonnage. It is variety — many sections, small batches, released building by building.
Scope of Fabrication
Our package ran from cutting to numbered delivery: cutting, fit-up, welding, straightening, shot blasting to Sa 2.5, coating, marking, packing and dispatch. Site erection and grouting were outside our scope:
Five months, with drawings chasing the site
Projects at this speed run design, detailing and construction in parallel, and fabrication sits at the front of that chain — a drawing a day late pushes everything behind it. We moved detailing support into the shop: a fabrication issue first, plain sections and connection plates stocked ahead, and production cut into building-by-building batches so the first building erected was the first one made. Nobody waited for the full set.
On a national key project, quality lands on the welders and the paperwork.
The specification was strict, so the company pulled its core crew onto the job and put the production director personally in charge of quality. Three controls did the work. First-off inspection — no batch released until the first piece passed. Certified welders only, with every weld traceable through member number, welder ID and shift. Dimensional deviation held in jigs, not corrected afterwards with heat.
Members are lifted as they arrive, so there is no window for rework
Site space was squeezed to the limit and components went from trailer to crane. A damaged coating means touching up inside the erection cycle. We used soft slings and timber packing between layers, turned member marks outward, and braced long pieces against transport distortion.
Tight Construction Schedule
The project had strict delivery deadlines to support factory commissioning plans, requiring efficient production coordination and installation management.
Project Advantages
Fast Construction Speed
Capacity is elastic. The point of a strategic partnership shows up on peak days: when the plant's own lines are full, we absorb the overflow and the delivery date does not move.
High Load Capacity
The documentation closes. What leaves the shop is not a dispatch note but a pack — mill certificates, re-test reports, NDT records, coating thickness logs and a member schedule — so site inspection and the final handover file both reconcile.
Flexible Expansion Capability
The quality system already existed. We hold ISO 9001, EN 1090 and CE, run 30,000 tons a year, and fabricate to the inspection habits of export work, which means a domestic key project does not need a parallel procedure bolted on.
Project Results
Fabrication was completed to the project's milestones in April 2018 and met the member acceptance standard. The Citizen Service Center opened in June 2018, with public services, the planning exhibition, temporary offices and the ecological park all in use.
Why Choose Our Steel Structure Solutions
This project continues to serve as a strong example of our ability to support world-class manufacturing infrastructure with reliable steel structure solutions.
Our Company
Our Factory
Quality & Certifications
Our Process
Warehouse & Logistics Projects
Commercial Projects
Public Infrastructure Projects
Airport & Transportation Projects
Sports Stadium Projects
Agricultural Projects
Steel Structure Buildings
Steel Structure Materials