Sun Yat-sen University Sixth Affiliated Hospital — Steel Column Fabrication Case
Project Overview
Project Name: Sun Yat-sen University Sixth Affiliated Hospital
Location: Zhuji Road, Guangzhou City, Guangdong Province
Project Type: Large hospital complex
Put into use:2025
Project Scale
The scope is stated plainly: structural steel column shop drawings, material procurement and fabrication, all in one contract. A single member type, but not a low bar — the detailing is ours to produce, not the client's drawings to copy.
Steel columns in hospital work are rarely the primary frame. They appear at the edges: link bridges, canopies, added floors, plant platforms, long-span entrances. Heavy individual pieces, low quantity, many interfaces with the concrete structure. So the difficulty here is not capacity. It is that every column has to land on something already built.
Structural Scope
Shop drawings settle more than most people expect: base plate size and anchor hole diameter, stiffener positions, end plate thickness and bolt layout at beam connections, splice location and weld preparation, lifting lugs and temporary connection plates, plus where painting stops and fire protection starts. Leave any of it open and the shop stops waiting for a drawing, or the site opens a hole with a torch.
Detailing is the starting point, and the main risk.
A hospital column has one end tied to concrete and the other to other trades: anchors cast in by the civils, beam-column joints that must meet concrete beam levels, fire protection and finishes that need their own thickness. Detail late and fabrication waits. Detail loosely and the site improvises. We keep detailing and fabrication with the same team, drawing to the shop's actual capability — what can be welded, drilled and bent is known at the drawing board.
Base plates always meet tolerance, and the design should absorb it, not the site
Cast-in anchors land off by anything from a few millimetres to well over ten. We slot the base plate holes to surveyed anchor positions, add shim plates and double nuts, and leave enough grout thickness. No torch opening on site: cut a base plate and the load path changes, and grout will not seal it.
Inside a working hospital, trucks do not simply arrive.
Site roads must stay clear for ambulances and patients, delivery windows are limited, and unloading space is tight. Members are therefore packed to erection sequence, shipped in one batch and lifted straight off. The single 18 July milestone puts production, coating, packing and transport on one line; a day lost anywhere upstream is a day lost at delivery.
Project Advantages
Detailing in-house, never subcontracted.
Drawings and process come from the same judgement, so weld preparation, hole positions and splice points are set to what the shop can actually do.
Allowance built into the base.
Slotted holes, shim plates, double nuts and grout thickness are all fixed on the drawing; site only aligns and tightens.
One batch, no laydown.
Numbered to erection sequence and packed by installation unit, lifted straight off the trailer with no second handling inside the hospital grounds.
Project Results
Columns were fabricated and delivered to the 18 July 2025 milestone, covering detailing, procurement and fabrication.
Why Choose Our Steel Structure Solutions
Steel columns for Sun Yat-sen University Sixth Affiliated Hospital: shop drawings, procurement and fabrication, delivered 18 July 2025. Slotted base plates, qualified diaphragm welding, single-batch delivery.
Our Company
Our Factory
Quality & Certifications
Our Process
Warehouse & Logistics Projects
Commercial Projects
Public Infrastructure Projects
Airport & Transportation Projects
Sports Stadium Projects
Agricultural Projects
Steel Structure Buildings
Steel Structure Materials