Daqiuzhuang Community Cultural Center — Curved Steel Frame Case
Public Infrastructure Projects
WPS图片(3)

Daqiuzhuang Community Cultural Center — Curved Steel Frame Case zy-tit-icon

Project Overview

Project Name: Daqiuzhuang Community Cultural Center

Location: Jinhai, Tianjin, Daqiu Zhuang

Project Type: Cultural, educational and recreational comprehensive project

Project Area:5060㎡ .

Put into use:2018

Send Inquiry

Project Scale

The building sits in the centre of Daqiuzhuang, Jinghai District, on a plot bounded by Weihe Road to the east, Hengshan Road to the south, Honghe Road to the west and Tuanbo Avenue to the north. Floor area is 5,060 m² in a curved steel frame, with around 1,200 tons of steelwork. We mobilised on 15 August 2018, finished erection on 31 August, and the building completed the same year.
Seventeen days. At 1,200 tons over 17 days that is close to 70 tons a day. Sustaining that means at least two cranes working in separate zones, members grouped and shipped in erection sequence, and no double handling inside the fence. One link slipping takes the rest with it.

Building area 5060㎡

Then the steel rate. 5,060 m² sharing 1,200 tons works out at 237 kg/m². A conventional multi-storey steel frame sits between 80 and 120. The excess is spent on the curve and the colonnade: a curved grid makes every column and every beam segment unique, and the colonnade overhang adds cantilever members and bracing on top. Shape has a price, and on the drawings that price is tonnage.

Structural Scope

Fabrication difficulty on a curved frame is not single-piece accuracy, it is accumulation. A column out by 3 mm is invisible; run that along a curve to the twentieth column and the colonnade stops being round. The setting-out datum therefore starts from the centre of curvature, positioning each column by radius and angle, rather than chaining from the neighbouring column.

WPS图片
Curved column grid — radial setting-out
WPS图片(2)
Curved frame beams — cold-bent, springback allowed
WPS图片(1)
Colonnade overhang — cantilever beams
01

Seventeen days, 1,200 tons, zoned flow only

Seventy tons a day is not bought with more people, it is bought with the right sequence. Members were grouped by erection zone in the shop, each group sized to one crane-day. Site ran two to three zones in parallel, with purlins and bracing following immediately behind each zone to form a stable plane before moving on. Double handling is a move that cannot appear at this pace.

02

Curve error accumulates, and beam springback must be allowed for

A cold-bent curved beam springs back, and the amount varies with radius and section; without allowance it will not fit. We bent in segments by curvature, measured springback on each, built the allowance into setting-out dimensions, and checked curvature against templates before dispatch. The grid was set by polar coordinates on one side and verified by chord length on the other, two checks locking each other.

03

Repair is harder than new build, because new connections land on old steel

Once roof, envelope, colonnade and entrances have aged, new members must hang off existing ones. Actual hole positions, corrosion and distortion are not on any drawing and can only be measured on site, member by member. Measurements went back to the shop, fabrication drawings were reissued, then steel shipped. Coating also changed: Sa 2.5 blasting is not achievable in situ, so surfaces were prepared to St3 with power tools and coated with epoxy primer and topcoat. Roof and eave flashings were fully remade, which is where leaks begin.

Project Advantages

01.

A curve set out radially.

Every column positioned from the centre of curvature, beams cold-bent by curvature with springback measured, curvature checked against templates before dispatch. The method is repeatable and does not depend on one fitter.

02.

Repair measured before it is made.

Existing hole positions, levels and distortion measured before cutting; new steel meets old steel first time, with no drilling out on site.

03.

Same district, twenty minutes away.

The plant is in Jinghai Economic Development Zone, the building in Daqiuzhuang. Repair work lives on repeat measurement and small replacement parts, and that distance makes a same-day round trip routine.

Project Results

Erection finished on 31 August 2018 and the building completed the same year as the community cultural venue for Daqiuzhuang. The later repair of roof, envelope, colonnade and entrances restored and improved its use, with the steel frame retained as the existing load-bearing system.

07-fig-h1-erection

Why Choose Our Steel Structure Solutions

Curved grids, set out radially
17 days, 1,200 tons
Repair measured, then made
Same district, 20 minutes
Coating redone on site
Twenty years, 5,000+ projects

A 5,060 m² community cultural center in Jinghai with a curved steel frame and around 1,200 tons of steel, erected in 17 days in 2018. Radial setting-out, zoned erection flow, and repair onto existing steel.