BAIC Passenger Car Base, Shunyi — Assembly Workshop Steel Structure Case
Project Overview
Project Name: BAIC Passenger Car Base, Shunyi — Assembly Workshop Steel Structure Case
Location: Beijing Industrial Design Research Institute General Contractor
Project Type: Construction of a large-scale domestic brand passenger vehicle production base
Designing unit:Beijing Industrial Design Institute
General Contracting Unit:China Emerging Construction Development Corporation
Structural form: Steel frame, steel roof truss
Total investment: one hundred million
Project Scale
The workshop sits in Shunyi District, Beijing, on BAIC Motor's own-brand passenger car base. The structural system is a steel frame carrying steel roof trusses; design was by Beijing Municipal Institute of Industrial Design, with China Xinxing Construction & Development as main contractor.
This was our first project alongside a large state-owned contractor. Until then our clients had been private and foreign-invested factories. The difference with a state-owned owner is not technical difficulty, it is process — drawing review, method statements, material approvals, hold-point inspections, document handover. Every step has a gate, and one missing paper stops the line. We learned that process on this job.
Scope of Structural Work
steel columns and frame beams, with the grid set back from the assembly lines, the water test line and the equipment bases.
Chinese code and German drawings had to land on the same shop detail.
Early in the project we dealt directly with the German design institute on the joint design. The two systems diverge less in principle than in detail: Eurocode EN 1993 on one side, GB 50017 checks on the other, and weld quality classes, bolt grades, tolerance callouts and member numbering all use different codes and defaults. We issued bilingual shop drawings checked against both standards, tabulated every point where the two disagreed, and closed each one at the design liaison meeting rather than leaving it to be guessed in the shop. That routine later became standard on our foreign-invested work.
In an assembly workshop, the load hangs from the bottom chord.
More is suspended over a final assembly line than over an ordinary factory: overhead conveyor, compressed air and services, sprinklers, high-bay lighting, plus a monorail for maintenance. None of it shows on the architectural drawing, and any of it missed at design stage means strengthening or a separate support frame after the roof is closed. We collected every trade's hanging points during detailing, marked them on the truss drawings as point and line loads by zone, and detailed the hangers as adjustable connections.
Approval sequencing at a state-owned project is harder to plan than production.
Incoming material, release of fabricated members, and covered works each need an inspector's signature before the next step. What a fabrication shop fears is finished steel held up by paperwork. We ran documents alongside the members — mill certificates, re-test reports, NDT records, coating logs travelling with each batch — instead of assembling them the week before inspection.
Tight Construction Schedule
The project had strict delivery deadlines to support factory commissioning plans, requiring efficient production coordination and installation management.
Project Advantages
Fast Construction Speed
A steel frame under steel trusses balances long span against heavy hanging load. The assembly line needs uninterrupted floor, the columns step aside, the trusses carry across, and grid and span can then be optimised separately instead of one condition being traded against the other.
High Load Capacity
The joint design paid beyond this contract. Working a scheme through with a German institute means going through European drafting conventions, load assumptions and connection practice end to end. Drawings on later foreign or joint-venture jobs could be read straight away.
Flexible Expansion Capability
Fabrication in the shop and erection on site keeps the interface clean. The main contractor tracks two milestones — delivery and completed erection — with fabrication quality carried by the shop's inspection records in between.
Project Results
Fabrication in the shop and erection on site keeps the interface clean. The main contractor tracks two milestones — delivery and completed erection — with fabrication quality carried by the shop's inspection records in between.
Why Choose Our Steel Structure Solutions
This project continues to serve as a strong example of our ability to support world-class manufacturing infrastructure with reliable steel structure solutions.
Our Company
Our Factory
Quality & Certifications
Our Process
Warehouse & Logistics Projects
Commercial Projects
Public Infrastructure Projects
Airport & Transportation Projects
Sports Stadium Projects
Agricultural Projects
Steel Structure Buildings
Steel Structure Materials