Project Overview

Project Name: Yangliuqing Town Yiwangsi Market Place Project

Location: No. 6, Jinjing Road, Xiyongmen Street, Xiqing District, Tianjin

Project Type: Large-scale contiguous commercial clusters

Project Area: 23000m² (Phase I Plant Area)

Total height:3 floors

Project Status: Successfully Delivered

Total investment: one hundred million

Send Inquiry

Project Scale

The site sits in the core residential catchment of Yangliuqing Town, Xiqing District, bounded by Liukou Road to the west, Jinjing Highway to the north, Yuyang Road to the south and Liuyi Road to the east. Planned site area is 23,000 m², with 26,000 m² above ground across a maximum of three storeys, an overall height of 18 m, and a total investment of roughly RMB 100 million.

Put 26,000 m² on 23,000 m² of land and the plot ratio comes out around 1.13 — a low-density, large-footprint retail building that spreads horizontally rather than stacking.


Total Development Area 23000 m²
Total investment one hundred million

That changes what the structure has to do. What a market sells, commercially, is continuous subdividable stall area and unobstructed circulation, and neither survives a column dropped in the wrong place. On a rough cost-per-square-metre basis the investment works out near RMB 3,800/m², and RMB 100 million has to cover civil works, MEP, fire protection and external works. In a steel scheme the room to manoeuvre sits in programme and site overheads, not in the material price itself.

Scope of Structural Work

steel frame columns with primary and secondary beams, loading zoned between retail floor loads and stall-area live loads.:

workshop 36
Main structure
workshop 39
Secondary framing and bracing
workshop 35
Floor system
workshop 38
CRoof and rooflights
Steel structure workshop10
Auxiliary industrial buildings
Steel structure7
Large-span roof systems
01

An 18 m height cap, three storeys and a large-span stall hall pull against each other

Three storeys inside 18 m leaves about 6 m per floor, and once beam depth, services, ceiling void and floor build-up are deducted, the clear height margin is thin. But a market also needs continuous open floor, and the longer the span, the deeper the beam and the less clear height that is left. The fix was to lock the framing direction down at concept stage: primary beams running the long axis of the stall rows, secondary beams tightened up, keeping structural depth inside the band where services can still route around it — rather than reopening the column grid at construction-document stage.

02

Four roads on four sides leaves almost nowhere to store material.

Liukou Road, Jinjing Highway, Yuyang Road and Liuyi Road enclose the plot, and inside the red line the site still has to take a construction road, a fabrication area and laydown. Components were therefore released from the factory in erection sequence — delivered as needed, lifted straight off the trailer — with an off-site consolidation yard absorbing the buffer. Erection ran zone by zone, and deliveries were kept out of the morning and evening peaks and the town's restricted hours.

03

Assembly-occupancy fire requirements land directly on member size and cost

A market holds a lot of people, and the fire load concentrates in the stall goods area, so the steel has to be protected to meet its fire resistance period. Coating thickness rises with the period required, and both appearance and cost move with it. The final approach was graded by element: full protection on the primary frame, protection sized to actual exposure on secondary members and the roof system, rather than one blanket specification across the job.

04

Tight Construction Schedule

The project had strict delivery deadlines to support factory commissioning plans, requiring efficient production coordination and installation management.

Project Advantages

01.

Fast Construction Speed

A high degree of prefabrication, with erection and bolting doing most of the work on site and very little wet trade. The plot adjoins a residential district and the Yangliuqing heritage quarter, where dust and noise limits are far tighter than on an industrial site — cutting out site mixing and formwork is part of meeting those obligations, not an optional extra.

02.

High Load Capacity

Long spans buy back flexibility in stall layout. Rental income depends on how many stalls can be carved out and how wide the aisles run; widen the bay spacing by one step and another layout becomes possible. That return only shows up in the operating years..

03.

Flexible Expansion Capability

Shop-fabricated components assembled on site also make the programme more predictable than cast-in-place. For a market scheme carrying RMB 100 million of investment and needing to open early to start recovering it, opening two or three months sooner usually matters more to cash flow than the material saving.

04.

Long-Term Durability

High-quality materials and advanced fabrication standards ensured long-term operational stability.

Project Results

The building is in service as the local farmers' market for Yangliuqing Town: three storeys above ground, 18 m overall height, 26,000 m² of above-ground floor area.

Workshop Building3

Why Choose Our Steel Structure Solutions

Large industrial project experience
Automotive manufacturing facility expertise
Precision steel fabrication capability
Strict quality management system
Fast project delivery performance
Proven experience with international brand projects

This project continues to serve as a strong example of our ability to support world-class manufacturing infrastructure with reliable steel structure solutions.