| Operating History |
10% |
How long the supplier has designed, manufactured, and delivered steel building systems. |
A documented operating history of at least five years, supported by verifiable project records. |
A newly established entity with no independently verifiable projects or legal operating information. |
Business registration details, project list, factory address, and references from recent customers. |
| Project References |
10% |
Whether previous projects are similar in size, building use, climate, and code requirements. |
At least three recent, comparable projects that can be independently contacted or documented. |
Only generic photographs, incomplete addresses, or references that cannot confirm project details. |
Completion dates, project locations, building sizes, scope of supply, and permission to contact references. |
| Engineering and Code Capability |
15% |
Ability to prepare structural calculations, drawings, connection details, and compliance documents for the project location. |
Named qualified engineers, documented design review procedures, and experience with the applicable local building code. |
No clear responsibility for engineering approval, missing calculations, or drawings supplied without revision control. |
Sample calculation package, design responsibility matrix, professional credentials, and code-compliance checklist. |
| Material Traceability |
10% |
Whether structural steel, fasteners, coatings, and other critical materials can be traced to approved specifications. |
Mill certificates, heat or batch numbers, inspection records, and a documented nonconformance process. |
Unclear material grades, missing certificates, or inability to match certificates with delivered components. |
Example material certificates, inspection and test plans, coating reports, and traceability samples. |
| Manufacturing Capacity |
15% |
Available fabrication capacity, production scheduling, quality controls, and the ability to meet the required volume. |
A written production plan showing reserved capacity, inspection hold points, and realistic monthly output. |
Capacity claims are not supported by schedules, equipment details, or current workload information. |
Factory capability statement, production schedule, equipment list, quality manual, and current order-load summary. |
| Delivery Reliability |
15% |
Performance in meeting agreed manufacturing, shipping, customs, and site-delivery milestones. |
A milestone-based schedule with documented controls for fabrication, packing, shipping, and delivery updates. |
An unusually short promise without assumptions, contingency planning, or responsibility for delays. |
Sample project schedule, delivery performance records, shipping terms, packaging plan, and delay-notification procedure. |
| Packaging and Shipment Control |
5% |
Protection against corrosion, moisture, impact, loss, and identification errors during transport and storage. |
Weather-resistant packaging, component labels, packing lists, loading photographs, and storage instructions. |
Unlabeled bundles, inadequate corrosion protection, or packing lists that do not match the drawings. |
Packaging specification, sample packing list, loading checklist, insurance details, and cargo-damage procedure. |
| Customer Support |
10% |
Responsiveness before purchase, during production, installation, commissioning, and warranty service. |
A named project manager, defined response times, regular progress reporting, and documented after-sales support. |
Communication depends on one salesperson or lacks an escalation path for technical and warranty issues. |
Communication plan, organization chart, service-level commitments, installation support scope, and warranty process. |
| Contract and Warranty Clarity |
10% |
Whether the contract clearly defines scope, exclusions, payment milestones, change orders, defects, and remedies. |
A detailed contract with measurable acceptance criteria, warranty duration, exclusions, and dispute procedures. |
Large advance payments, vague warranty language, undefined exclusions, or verbal promises absent from the contract. |
Redacted contract template, warranty terms, payment schedule, change-order form, and acceptance checklist. |